EXPLORE GREAT 3D MODEL 76 . National Stadium of China
$150.00 – $175.00
Description
National Stadium of China .
Located at the Olympic Green, the stadium cost US$428 million. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003 after a bidding process that included 13 final submissions. The design, which originated from the study of Chinese ceramics, implemented steel beams in order to hide supports for the retractable roof; giving the stadium the appearance of a bird’s nest. Leading Chinese artist Ai Weiwei was the artistic consultant on the project.[5] The retractable roof was later removed from the design after inspiring the stadium’s most recognizable aspect. Ground was broken on 24 December 2003 and the stadium officially opened on 28 June 2008. A shopping mall and a hotel are planned to be constructed to increase use of the stadium, which has had trouble attracting events, football and otherwise, after the Olympics
يقع الاستاد في أولمبيك جرين ، وتبلغ تكلفته 428 مليون دولار أمريكي. تم منح التصميم إلى تقديم من شركة الهندسة المعمارية السويسرية Herzog & de Meuron في أبريل 2003 بعد عملية تقديم
العطاءات التي تضمنت 13 طلبًا نهائيًا. التصميم ، الذي نشأ من دراسة الخزف الصيني ، استخدم عوارض فولاذية لإخفاء دعامات السقف القابل للطي ؛ إعطاء الاستاد مظهر عش الطائر. الفنان الصيني
الرائد آي ويوي كان المستشار الفني للمشروع. [5] تمت إزالة السقف القابل للسحب لاحقًا من التصميم بعد إلهام الجانب الأكثر تميزًا في الاستاد. تم كسر الأرض في 24 ديسمبر 2003 وافتتح الملعب
رسميًا في 28 يونيو 2008. من المقرر إنشاء مركز تجاري وفندق لزيادة استخدام الملعب ، والذي واجه صعوبة في جذب الأحداث وكرة القدم وغير ذلك ، بعد الألعاب الأولمبية
Reviews
There are no reviews yet.